0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Temburong Bridge, Brunei – Independent Design Check

 Temburong Bridge, Brunei – Independent Design Check
Auteur(s): , ,
Présenté pendant IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, publié dans , pp. 2062-2069
DOI: 10.2749/222137815818359564
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.08 MB

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. For a...
Lire plus

Détails bibliographiques

Auteur(s): (COWI A/S, Kongens Lyngby, Denmark)
(COWI A/S, Kongens Lyngby, Denmark)
(Othman & Associates, Brunei Darussalam)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Publié dans:
Page(s): 2062-2069 Nombre total de pages (du PDF): 8
Page(s): 2062-2069
Nombre total de pages (du PDF): 8
Année: 2015
DOI: 10.2749/222137815818359564
Abstrait:

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. For a project of this significance, an independent category 3 design check has been carried out of the tender design. The check includes structural and geotechnical verification of the 13km long marine viaduct, two cable-stayed bridges across the navigation channels, and three tunnels. The paper describes the objective and process of the independent design check. The checker provides comments to the design drawings and the design basis, and the designer provide replies. The checker has to set up completely independent analysis models. As an example, the finite element models of the pile foundation and the deck of the cable-stayed bridges is presented. For the cable-stayed bridges the construction process and the cable rupture analysis is discussed.

Ouvrages et projets