0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

ShiZiYang Bridge – General Scheme Design Options for Mega Suspension Bridge

 ShiZiYang Bridge – General Scheme Design Options for Mega Suspension Bridge
Auteur(s): , , ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 135-144
DOI: 10.2749/nanjing.2022.0135
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.18 MB

The ShiZiYang suspension bridge in the Guangdong province in China will when constructed have a world record main span of 2180 m and carry an impressive 2 x 8 lanes of traffic on the double-deck tr...
Lire plus

Détails bibliographiques

Auteur(s): (College of Civil Engineering, Tongji University, Shanghai, China)
(Deputy Chief Engineer, Guangdong Provincial Communication Group Company Limited, China)
(Chief Engineer, Guangdong Bay Area Transportation Construction Investment Co. Ltd., China)
(Associate Project Director, COWI A/S, Denmark)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 135-144 Nombre total de pages (du PDF): 10
Page(s): 135-144
Nombre total de pages (du PDF): 10
DOI: 10.2749/nanjing.2022.0135
Abstrait:

The ShiZiYang suspension bridge in the Guangdong province in China will when constructed have a world record main span of 2180 m and carry an impressive 2 x 8 lanes of traffic on the double-deck truss girder. A bridge of this previously unmatched proportion requires innovative design concepts to develop a feasible and constructable bridge. The ShiZiYang Crossing owner organization invited three well-known bridge design companies in the initial design process to develop different options for overall configuration of girder, tower, anchorage, and cable system. Each of the different concepts have their own merits and regardless which one is chosen it will be on the limit to what has previously been achieved. While focusing on minimizing the deck weight, many other items must be taken into consideration such as aerodynamic stability, operation and maintenance, construction, cost, and aesthetic value. Comprehensive comparison of various options was thus carried out to select promising options that can serve as the basis for work of the next phase.

Mots-clé:
pont suspendu treillis
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.

Ouvrages et projets