0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Research on Key Technology of Large Tonnage Steel Beam Fast Sliding Positioning

 Research on Key Technology of Large Tonnage Steel Beam Fast Sliding Positioning
Auteur(s): , ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 1015-1022
DOI: 10.2749/nanjing.2022.1015
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.24 MB

A certain bridge adopts the green design of "one span across the river", and the installation of 21 pieces of steel box girder on the south span is limited by geographical conditions, tower limb wi...
Lire plus

Détails bibliographiques

Auteur(s): (CCCC Shec Fourth Engineering Co., Ltd)
(Shanghai Tongji Detection Technology Co)
(Shaoxing College of Arts and Sciences)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 1015-1022 Nombre total de pages (du PDF): 8
Page(s): 1015-1022
Nombre total de pages (du PDF): 8
DOI: 10.2749/nanjing.2022.1015
Abstrait:

A certain bridge adopts the green design of "one span across the river", and the installation of 21 pieces of steel box girder on the south span is limited by geographical conditions, tower limb width and construction period. Innovatively developed a dedicated skid scooter, the steel box girder successfully crosses the orbit change position with the help of the windlass,move laterally to the tower area,replace the longitudinal skid scooter,move to the design bridge. In the steel beam positioning link, firstly, set bearing pre-offsetting on pier top support to circumvent the influence of steel box girder welding, shrinkage creep deformation and closure temperature difference on the displacement of beam length. After the bridge is completed, the feasibility and reliability of the research method are verified by elevation measurement, static load test and implementation process.

Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.