0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Recent Development and Challenges of Long-Span Railway Cable- Stayed Bridges in China

 Recent Development and Challenges of Long-Span Railway Cable- Stayed Bridges in China
Auteur(s):
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 338-347
DOI: 10.2749/nanjing.2022.0338
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.22 MB

The main span of railway cable-stayed bridge in China has broken through from 312m in 2000 to 1092m in 2020, with rapid development in recent years. It comes from aspects of new material, new struc...
Lire plus

Détails bibliographiques

Auteur(s): (Railway Engineering Research Institute, China Academy of Railway Sciences Corporation Limited, Beijing, China; State Key Laboratory for Track Technology of High-speed Railway, Beijing, China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 338-347 Nombre total de pages (du PDF): 10
Page(s): 338-347
Nombre total de pages (du PDF): 10
DOI: 10.2749/nanjing.2022.0338
Abstrait:

The main span of railway cable-stayed bridge in China has broken through from 312m in 2000 to 1092m in 2020, with rapid development in recent years. It comes from aspects of new material, new structural form, accelerated bridge construction method, and innovated construction facilities and equipment. New materials mainly include bridge structural steel with higher yield strength, stay cable with higher tensile strength and ultra-high-performance concrete (UHPC), etc. New structural forms refer to three-main truss with three-cable plane, cable-stayed bridge with ballastless track system, multi-pylon railway cable-stayed bridge, etc. Concept of accelerated bridge construction has been also applied in caisson construction, truss girder assembling, truss girder hoisting, etc. Several new facilities and equipment have also been created such as integral bridge expansion joint, hoisting crane, and smart torque wrench, and so on. Challenges have also been discussed.

Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.

Ouvrages et projets

Lieux géographiques