Rapid Design and Construction Management of Emergency Hospital During the COVID-19 Epidemic

 Rapid Design and Construction Management of Emergency Hospital During the COVID-19 Epidemic
Auteur(s): , , ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 2048-2049
DOI: 10.2749/nanjing.2022.2048
Cette publication n'est pas disponible en texte intégral pour l'instant.
Télécharger l'aperçu (fichier PDF) 0.27 MB

In order to control the spread of the COVID-19 epidemic across the country, China has used all available resources to build infectious disease hospitals in various ways. These hospitals include thr...
Lire plus

Détails bibliographiques

Auteur(s): (Central-South Architectural Design Institute Co. Ltd, Hubei, People’s Republic of China)
(Central-South Architectural Design Institute Co. Ltd, Hubei, People’s Republic of China)
(Central-South Architectural Design Institute Co. Ltd, Hubei, People’s Republic of China)
(Central-South Architectural Design Institute Co. Ltd, Hubei, People’s Republic of China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 2048-2049 Nombre total de pages (du PDF): 2
Page(s): 2048-2049
Nombre total de pages (du PDF): 2
DOI: 10.2749/nanjing.2022.2048
Abstrait:

In order to control the spread of the COVID-19 epidemic across the country, China has used all available resources to build infectious disease hospitals in various ways. These hospitals include three modes and adapt to different disease levels: temporary emergency hospitals; makeshift hospitals by transforming public buildings; and existing general wards transformed into infectious wards. Through the practice of several projects, on the basis of the original standard system, China urgently issued a series of relevant standards and guidelines to guide the construction of temporary hospitals. As one of the earliest cases of temporary emergency infectious disease hospital, the Thunder God Mountain Hospital adopted a prefabricated modular design concept in plan design, plane design and component design, and also combined the application of Building Information Modeling (BIM) and Computational Fluid Dynamics (CFD) technology. Based on industrialized module processing and manufacturing, combined with an efficient on-site construction management system, the problem was solved of completing the construction in a very short time, which played a key role in controlling the epidemic situation.