The Overall Design and Application of M280 Cable System of the Mingyuexia Yangtze River Bridge of Chongqing Donghuan Railway

The Overall Design and Application of M280 Cable System of the Mingyuexia Yangtze River Bridge of Chongqing Donghuan Railway
Auteur(s): , ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 2083-2084
DOI: 10.2749/nanjing.2022.2083
Cette publication n'est pas disponible en texte intégral pour l'instant.
Télécharger l'aperçu (fichier PDF) 0.28 MB

Mingyuexia Yangtze River Bridge is a (62.5+125+425+175+75) m double-deck four-line railway steel truss girder cable-stayed bridge with high and low towers. In view of characteristics of the bridge ...
Lire plus

Détails bibliographiques

Auteur(s): (China Railway Eryuan Engineering Group Co. Ltd, Chengdu 610036, China)
(China Railway Eryuan Engineering Group Co. Ltd, Chengdu 610036, China)
(China Railway Eryuan Engineering Group Co. Ltd, Chengdu 610036, China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 2083-2084 Nombre total de pages (du PDF): 2
Page(s): 2083-2084
Nombre total de pages (du PDF): 2
DOI: 10.2749/nanjing.2022.2083
Abstrait:

Mingyuexia Yangtze River Bridge is a (62.5+125+425+175+75) m double-deck four-line railway steel truss girder cable-stayed bridge with high and low towers. In view of characteristics of the bridge heavy design load and prominent fatigue problems, the pressure area adopts steel-concrete combination with closed box chamber structure between the lower beam. Steel truss beam adopts regional and different internal force types of fatigue loading coefficient to improve the economy. The cable adopts the 280MPa high fatigue stress amplitude cable system to extend cable change cycle. Fatigue and safety durability of the cables are comprehensively improved by a variety of means, including improvement of the stress of cable base metal, reduction of bending stress of the transition section, improvement of clip structure, more than 70% of life span is increased compared with the M250 cable.

Mots-clé:
Pont à haubans

Ouvrages et projets