New Precast Concrete Segmental High-Speed Railway Bridges from Lianyungang to Xuzhou: Donghai Viaduct and Daxu Viaduct

 New Precast Concrete Segmental High-Speed Railway Bridges from Lianyungang to Xuzhou: Donghai Viaduct and Daxu Viaduct
Auteur(s): , ,
Présenté pendant IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, publié dans , pp. 1083-1091
DOI: 10.2749/manchester.2024.1083
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

Donghai Viaduct and Daxu Viaduct as parts of Lianyungang to Xuzhou high-speed railway bridge, are both the first high-speed railway continuous girder bridges using short-line precast segmental meth...
Lire plus

Détails bibliographiques

Auteur(s): (Sun Engineering Consultants International, Inc., Guangzhou, China)
(Sun Engineering Consultants International, Inc., Guangzhou, China)
(Sun Engineering Consultants International, Inc., Guangzhou, China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024
Publié dans:
Page(s): 1083-1091 Nombre total de pages (du PDF): 9
Page(s): 1083-1091
Nombre total de pages (du PDF): 9
DOI: 10.2749/manchester.2024.1083
Abstrait:

Donghai Viaduct and Daxu Viaduct as parts of Lianyungang to Xuzhou high-speed railway bridge, are both the first high-speed railway continuous girder bridges using short-line precast segmental method in China. A big achievement of the project is realizing a high prefabricated proportion of 99.1% and 98.8% respectively for main bodies of both viaducts.

The Accelerated Bridge Construction with the precast segmental bridge technology, using the short- line match casting method and balanced cantilever construction method without closure pour at end spans in the Lianxu project, has built up a good basis for future projects.

This paper introduces several key factors during the construction process of Donghai Viaduct and Daxu Viaduct, including precast yards, construction method, geometry control and BIM, providing more choices for Accelerated Bridge Construction.