The Luitpold suspension bridge over the Danube River in Passau ‐ renovation of a 70‐year‐old suspension bridge under special boundary conditions

The Luitpold suspension bridge over the Danube River in Passau ‐ renovation of a 70‐year‐old suspension bridge under special boundary conditions
Auteur(s): ,
Présenté pendant IABSE Conference: Engineering the Past, to Meet the Needs of the Future, Copenhagen, Denmark, 25-27 June 2018, publié dans , pp. 256-266
DOI: 10.2749/copenhagen.2018.256
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.23 MB

Obvious corrosion damage on load‐bearing steel and concrete elements made a general renovation of the bridge superstructure necessary. In particular a renewal of the anti‐corrosion coating of the...
Lire plus

Détails bibliographiques

Auteur(s): (bulicek+ingenieure gmbh, Munich)
(bulicek+ingenieure gmbh, Munich)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Engineering the Past, to Meet the Needs of the Future, Copenhagen, Denmark, 25-27 June 2018
Publié dans:
Page(s): 256-266 Nombre total de pages (du PDF): 11
Page(s): 256-266
Nombre total de pages (du PDF): 11
DOI: 10.2749/copenhagen.2018.256
Abstrait:

Obvious corrosion damage on load‐bearing steel and concrete elements made a general renovation of the bridge superstructure necessary. In particular a renewal of the anti‐corrosion coating of the steel components as well as a complete renewal of the concrete deck slab have been unavoidable.

A variety of restrictive constraints in terms of cargo and passenger shipping, the necessity of a permanent pedestrian path on the bridge and numerous non‐removable service pipes complicated the maintenance work dramatically and required a detailed reconstruction concept especially considering static, structural and economic aspects.

A major challenge was also the development of a computational model describing the real structural behavior with sufficient accuracy during and after renovation. Due to the lack of inventory documents an experimental validation and in addition an on‐site monitoring had to be carried out.

As is often the case for existing buildings, the total extent of necessary reconstruction work became apparent only after the first deck slab sections were removed. The remains of leadcontaining coating layers, which also came to light during the course of reconstruction, made the abrasive blast clearing even more difficult.