0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Construction of the Multi-span Cable Stayed Bridge at Ambhora, near Nagpur, Maharashtra

 Construction of the Multi-span Cable Stayed Bridge at Ambhora, near Nagpur, Maharashtra
Auteur(s): , ,
Présenté pendant IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, publié dans , pp. 719-726
DOI: 10.2749/newdelhi.2023.0719
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.99 MB

The multi-span cable stayed bridge over river Wainganga near Ambhora, Maharashtra, has an overall length of 705m and deck width of 15.25m to accommodate 2 lanes of vehicular traffic and 3m+3m footp...
Lire plus

Détails bibliographiques

Auteur(s): (SPECTRUM Techno Consultants Pvt Ltd, Navi Mumbai, India)
(Chairman and Managing Director, Construma Consultancy Pvt. Ltd.)
(SPECTRUM Techno Consultants Pvt Ltd, Navi Mumbai, India)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Publié dans:
Page(s): 719-726 Nombre total de pages (du PDF): 8
Page(s): 719-726
Nombre total de pages (du PDF): 8
DOI: 10.2749/newdelhi.2023.0719
Abstrait:

The multi-span cable stayed bridge over river Wainganga near Ambhora, Maharashtra, has an overall length of 705m and deck width of 15.25m to accommodate 2 lanes of vehicular traffic and 3m+3m footpath for pedestrians. The structural arrangement of the bridge comprises 2 modules, with Module 1 of 420m and Module 2 of 280m length with span arrangements of 70m+140m+140m+70m and 70m+140m+70m respectively. The superstructure is cable stayed with RCC deck with an RCC pylon height of 30m above deck level. The pylon P3 at the center of the bridge is also proposed with Viewing Gallery 40m above deck level which is structurally independent from the main bridge. This paper discusses the construction aspects of the bridge along with the details of a special travelling formwork (form-traveller) used to enable the cantilever construction of the spans over deep waters. The Module 1 of the bridge is constructed by cantilever method for pylon P2 and anchored span method for pylon P1 and P3. The Module 2 of the bridge is constructed entirely on staging. This is one of the very few cable-stayed bridges in India where all 3 methods of construction of a cable stayed superstructure are adopted in the same bridge.