0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Application of BIM to a Cable-stayed Bridge Construction

 Application of BIM to a Cable-stayed Bridge Construction
Auteur(s): , , ,
Présenté pendant IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, publié dans , pp. 62-69
DOI: 10.2749/222137809796068127
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.18 MB

3D modeling and BIM technology are being used more and more in the construction industry. The scope of this paper arose as we wondered how the general contractor can benefit from the use of 3D mode...
Lire plus

Détails bibliographiques

Auteur(s):



Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Publié dans:
Page(s): 62-69 Nombre total de pages (du PDF): 6
Page(s): 62-69
Nombre total de pages (du PDF): 6
Année: 2009
DOI: 10.2749/222137809796068127
Abstrait:

3D modeling and BIM technology are being used more and more in the construction industry. The scope of this paper arose as we wondered how the general contractor can benefit from the use of 3D models. Presented herewith is the application of BIM to an actual bridge now under construction in Cheongpoong, Choongcheongbuk-Do. This constitutes the first application of BIM in Korea. Virtual construction of the cable-stayed bridge was performed to visualize design and analyze constructability and coordination problems and to integrate the bridge’s visualization, cost, and schedule under location-based conditions with industry-specific solutions for 3D modeling. Two hundred and ninety-two main 3D objects constituted the cable-stayed bridge, which is 442m long with a main span of 327m. BIM application benefits such as clash detection, interdisciplinary communication, and method-statement simulation have been confirmed. In addition, integration of a 3D model, cost, and schedule is shown by comparing the measurements of different structures at a specific time using 2 different construction sequencing scenarios and work breakdown structures (WBS). It is possible to create dynamic graphics and effects and explore complete projects under real-world conditions before they are constructed.

Mots-clé:
Pont à haubans