Advantage of 4th Generation Modular Joint from life cycle cost point of view – a case study

 Advantage of 4th Generation Modular Joint from life cycle cost point of view – a case study
Auteur(s): , ,
Présenté pendant IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, publié dans , pp. 1497-1504
DOI: 10.2749/newdelhi.2023.1497
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 1.2 MB

While the design life of a bridge is generally estimated to be around 100 years, an important component of the bridge, viz. expansion joints have a much shorter service life – typically between 10 ...
Lire plus

Détails bibliographiques

Auteur(s): (mageba Bridge Products Private Limited)
(mageba Bridge Products Private Limited)
(mageba Bridge Products Private Limited)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Publié dans:
Page(s): 1497-1504 Nombre total de pages (du PDF): 8
Page(s): 1497-1504
Nombre total de pages (du PDF): 8
DOI: 10.2749/newdelhi.2023.1497
Abstrait:

While the design life of a bridge is generally estimated to be around 100 years, an important component of the bridge, viz. expansion joints have a much shorter service life – typically between 10 to 20 years. Therefore, expansion joints need to be replaced quite a few times during the service life of the bridge. The total cost of ownership (TCO} of a product is defined by the sum of all the costs incurred by the owner at different stages, i.e., initial procurement and installation cost, regular inspection & maintenance cost and possible replacement cost involving engineering, project management, cost of new expansion joints and auxiliary civil works. Replacement of expansion joints not only forms the biggest component of TCO, but it also involves hardships to the bridge users during the replacement work which might need one or multiple lane closures, if not closure of the entire bridge, causing intangible cost of ownership. As such the bridge owners need to exercise discretion during selection of the product to ensure minimum number of replacements during the service life of the bridge and minimise the closure during the replacement work to keep a check on TCO and possibly on reduced collection of toll revenue.

4th Generation Modular Expansion Joints addresses the aforesaid issues with longer time interval between replacement work (> 15 years}, minimum interruption to traffic during replacement and thus minimal loss of revenue due to possibility of a quick replacement work. Recently the Modular Expansion Joints on the major bridge over river Sone in the Indian state of Bihar was refurbished within a very short time, minimising traffic interruption, thanks to the detailing of the modular expansion joint.

Mots-clé:
Joint de dilatation