Highlights of the design and construction of a 12 km elevated APM bridge project in Saudi Arabia

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Structural Concrete, , n. 3, v. 14
Page(s): 250-259
DOI: 10.1002/suco.201200050
Abstrait:

The automated people mover (APM) bridge project constructed at Princess Nora University (PNU) in Saudi Arabia and inaugurated in May 2012 is a major project with many challenges in design and construction due to its strict time-frame compared with the big scale of the project. Therefore, the design had to be such that it ensured simplicity, time-savings, lowest costs, aesthetics and the high quality required for bridge project elements. For aesthetic reasons, a box section was chosen for all the APM bridge sections for the bridge project, including straight, bifurcation and curved parts. This paper highlights the efficiency of the precast concrete techniques used in the design and construction of big projects such as this elevated APM bridge project at PNU in Saudi Arabia.

Mots-clé:
ponts caisson
Disponible chez: Voir chez l'éditeur

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1002/suco.201200050.
  • Informations
    sur cette fiche
  • Reference-ID
    10069266
  • Publié(e) le:
    15.12.2013
  • Modifié(e) le:
    13.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine